A total of more than Sixteen Years Experiences in :
* Engineering Works for Production and Development of Mechanical such as :
a. Fabrication and Installation of Mechanical such as : Steel Structure, Process Piping, Pipe Line
Sub Marine, Pipe System Structural (Jacket), Double Wall Tank & Spherical Tank, Pressure
Vessel, Boiler, Filter Separator, Heat Exchanger, Steam Turbine, Gas Turbine in Offshore &
Onshore, Refineries, F.P.S.O, Gas Processing Plant, Chemical Plant, Power Plant, Steel Plant,
Coal Plant, Tower Building, Steel Building, Ship Building and Drilling Rig.
b. Fabrication and Installation on Factory or Site and familiar with Design Standard, such as:
Code Specification,
1. API Spec 5L, Specification for Pipe Line
2. API Std-1104, Welding of Pipe Line
3. ASME B-31.1, Power Piping
4. ASME B-31.3, Chemical Plant and Petroleum Refinery Piping
5. API Std-620, Design and Construction of Large, Welded Low-Pressure Storage Tanks
(Double Wall Tanks)
6. API Std-650, Welded Steel Tanks for Oil Storage (Ordinary Tanks)
7. ASME-V, Nondestructive Examination (Testing)
8. ASME-VIII, Pressure Vessels (Spherical Tanks)
9. ASME-IX, Welding and Brazing Qualifications
10. AISC Standard, Manual of Steel Construction (Ship Building)
c. Fabrication and Installation of New Ship Building including Steel Work, Piping, Accommodation
(Carpentries), Electrical, Engine Services and Ship Repair Services.
* Engineering Department to Managing of Designing, Planning, Material Take-off and Documentation.
a. Fabrication and Installation of Mechanical such as : Steel Structure, Process Piping, Pipe Line
Sub Marine, Pipe System Structural (Jacket), Double Wall Tank & Spherical Tank, Pressure
Vessel, Boiler, Filter Separator, Heat Exchanger, Steam Turbine, Gas Turbine in Offshore &
Onshore, Refineries, F.P.S.O, Gas Processing Plant, Chemical Plant, Power Plant, Steel Plant,
Coal Plant, Tower Building, Steel Building, Ship Building and Drilling Rig.
b. Fabrication and Installation on Factory or Site and familiar with Design Standard, such as:
Code Specification,
1. API Spec 5L, Specification for Pipe Line
2. API Std-1104, Welding of Pipe Line
3. ASME B-31.1, Power Piping
4. ASME B-31.3, Chemical Plant and Petroleum Refinery Piping
5. API Std-620, Design and Construction of Large, Welded Low-Pressure Storage Tanks
(Double Wall Tanks)
6. API Std-650, Welded Steel Tanks for Oil Storage (Ordinary Tanks)
7. ASME-V, Nondestructive Examination (Testing)
8. ASME-VIII, Pressure Vessels (Spherical Tanks)
9. ASME-IX, Welding and Brazing Qualifications
10. AISC Standard, Manual of Steel Construction (Ship Building)
c. Fabrication and Installation of New Ship Building including Steel Work, Piping, Accommodation
(Carpentries), Electrical, Engine Services and Ship Repair Services.
* Engineering Department to Managing of Designing, Planning, Material Take-off and Documentation.
DETAILED PROFESSIONAL EXPERIENCES
OF
DIRECTOR
OF
DIRECTOR
1. Name of Project : Arthit and North Belut Project
Position : Project Manager
Job Description : Deck Support Frame (DSF) and Temporary Construction Support Frame
(TCSF) - Hand rail and Pipe Support
Company : PT. Valent Barat Engineering
Location : PT. Nexus Engineering, Tg Uncang - Batam - Indonesia
Owner : PT. Mc Dermott Indonesia
Period : April 05, 2007 up to October 27, 2007
2. Name of Project : Arthit and Wood Side Project
Position : Piping Manager
Job Description : Piping Fabrication (Stainless Steel, Carbon Steel, Cu-Ni, Bonstrant)
Company : PT. Mc Dermott Indonesia
Location : Batu Ampar - Batam - Indonesia
Owner : PT. Mc Dermott Indonesia
Period : September 01, 2006 up to March 09, 2007
3. Name of Project : Carigali Pipe Line Project
Position : Pipe Line Manager
Job Description : Fabrication & Installation Sub Marine Pipe Line of the Gas Pipe 8", 6.5
Miles and Oil Pipe 16", 9.2 Miles at Terengganu Sea (Malaysia)
Company : Carigali (M) Sdn Bhd
Location : Paka, Terengganu, Malaysia
Owner : Petronas Gas (M) Berhad
Period : November 15, 2005 up to July 15, 2006
4. Name of Project : Amenam AMP-1 & AMP-2 Project
Position : Engineering Coordinator
Job Description : Fabrication & Erection Steel Structure and Piping
Company : Sime Darby Engineering. Sdn Bhd
Location : Pasir Gudang, Johor. Malaysia
Owner : Elf Ptroleum Nigeria. Limited
Period : November 01, 2004 up to November 01, 2005
5. Name of Project : Belanak F.P.S.O. R-2346 Project
Position : Production Manager
Job Description : Fabrication & Erection of Steel Structure and Piping
Company : PT. Mc Dermott Indonesia
Location : Batu Ampar - Batam
Owner : Conoco Indonesia Inc. Ltd
Period : October 29, 2002 up to October 29, 2004
6. Name of Project : Centralizaty Utility Facility (C.U.F) Project
Position : Piping Manager
Job Description : Fabrication & Erection of Pipe Spools and Pipe Support
Company : Tetracon Engineering. Sdn Bhd
Location : Gebeng, Kuantan, Malaysia
Owner : Petronas Gas (M) Berhad
Period : February 1999 up to May 2000
7. Name of Project : Gas Processing Plant (G.P.P. 5 & 6) Project
Position : Tank Superintendent
Job Description : Tank Erection
Company : Daelim (M) Sdn Bhd
Location : Paka, Terengganu, Malaysia
Owner : Petronas Gas (M) Berhad
Period : September 1996 up to November 1998
8. Name of Project : CCM Chlor-Alkali Project
Position : Tank Engineer
Job Description : Tank Fabrication & Erection
Company : Vesseltech Engineering. Sdn Bhd
Location : Pasir Gudang, Johor, Malaysia
Owner : CCM Chemical (M) Berhad
Period : December 1995 up to September 1996
9. Name of Project : Amoco Chemical Plant Project
Position : Steel Structure Supervisor
Job Description : Steel Structure Fabrication & Erection
Company : Barisan Cerdas. Sdn Bhd
Location : Gebeng, Kuantan, Malaysia
Owner : Amoco. Co Ltd
Period : April 1995 up to October 1995
10. Name of Project : Twin Tower (K.L.C.C) Project
Position : Steel Structure Engineer
Job Description : Steel Structure Erection
Company : Bagan Beribu. Sdn Bhd
Location : Kuala Lumpur, Malaysia
Owner : Petronas Malaysia Berhad
Period : November 1993 up to March 1995
11. Name of Project : Perwaja Steel (Steel Plant) Project
Position : Steel Structure Supervisor
Job Description : Steel Structure Fabrication & Erection
Company : Jimsburg Services. Sdn Bhd
Location : Kemaman, Terengganu, Malaysia
Owner : Perwaja Steel Malaysia Berhad
Period : January 1991 up to October 1993
Position : Project Manager
Job Description : Deck Support Frame (DSF) and Temporary Construction Support Frame
(TCSF) - Hand rail and Pipe Support
Company : PT. Valent Barat Engineering
Location : PT. Nexus Engineering, Tg Uncang - Batam - Indonesia
Owner : PT. Mc Dermott Indonesia
Period : April 05, 2007 up to October 27, 2007
2. Name of Project : Arthit and Wood Side Project
Position : Piping Manager
Job Description : Piping Fabrication (Stainless Steel, Carbon Steel, Cu-Ni, Bonstrant)
Company : PT. Mc Dermott Indonesia
Location : Batu Ampar - Batam - Indonesia
Owner : PT. Mc Dermott Indonesia
Period : September 01, 2006 up to March 09, 2007
3. Name of Project : Carigali Pipe Line Project
Position : Pipe Line Manager
Job Description : Fabrication & Installation Sub Marine Pipe Line of the Gas Pipe 8", 6.5
Miles and Oil Pipe 16", 9.2 Miles at Terengganu Sea (Malaysia)
Company : Carigali (M) Sdn Bhd
Location : Paka, Terengganu, Malaysia
Owner : Petronas Gas (M) Berhad
Period : November 15, 2005 up to July 15, 2006
4. Name of Project : Amenam AMP-1 & AMP-2 Project
Position : Engineering Coordinator
Job Description : Fabrication & Erection Steel Structure and Piping
Company : Sime Darby Engineering. Sdn Bhd
Location : Pasir Gudang, Johor. Malaysia
Owner : Elf Ptroleum Nigeria. Limited
Period : November 01, 2004 up to November 01, 2005
5. Name of Project : Belanak F.P.S.O. R-2346 Project
Position : Production Manager
Job Description : Fabrication & Erection of Steel Structure and Piping
Company : PT. Mc Dermott Indonesia
Location : Batu Ampar - Batam
Owner : Conoco Indonesia Inc. Ltd
Period : October 29, 2002 up to October 29, 2004
6. Name of Project : Centralizaty Utility Facility (C.U.F) Project
Position : Piping Manager
Job Description : Fabrication & Erection of Pipe Spools and Pipe Support
Company : Tetracon Engineering. Sdn Bhd
Location : Gebeng, Kuantan, Malaysia
Owner : Petronas Gas (M) Berhad
Period : February 1999 up to May 2000
7. Name of Project : Gas Processing Plant (G.P.P. 5 & 6) Project
Position : Tank Superintendent
Job Description : Tank Erection
Company : Daelim (M) Sdn Bhd
Location : Paka, Terengganu, Malaysia
Owner : Petronas Gas (M) Berhad
Period : September 1996 up to November 1998
8. Name of Project : CCM Chlor-Alkali Project
Position : Tank Engineer
Job Description : Tank Fabrication & Erection
Company : Vesseltech Engineering. Sdn Bhd
Location : Pasir Gudang, Johor, Malaysia
Owner : CCM Chemical (M) Berhad
Period : December 1995 up to September 1996
9. Name of Project : Amoco Chemical Plant Project
Position : Steel Structure Supervisor
Job Description : Steel Structure Fabrication & Erection
Company : Barisan Cerdas. Sdn Bhd
Location : Gebeng, Kuantan, Malaysia
Owner : Amoco. Co Ltd
Period : April 1995 up to October 1995
10. Name of Project : Twin Tower (K.L.C.C) Project
Position : Steel Structure Engineer
Job Description : Steel Structure Erection
Company : Bagan Beribu. Sdn Bhd
Location : Kuala Lumpur, Malaysia
Owner : Petronas Malaysia Berhad
Period : November 1993 up to March 1995
11. Name of Project : Perwaja Steel (Steel Plant) Project
Position : Steel Structure Supervisor
Job Description : Steel Structure Fabrication & Erection
Company : Jimsburg Services. Sdn Bhd
Location : Kemaman, Terengganu, Malaysia
Owner : Perwaja Steel Malaysia Berhad
Period : January 1991 up to October 1993